The stack is a large often 3 or 4 inch diameter vertical pipe that runs from above the roof down to the main sewer line.
Minimum dwv extension above roofing.
If you were in michigan the mrc would apply p3103 1 roof extension.
If a roof is to be used for any purpose other than weather protection the vent shall be extended at least seven 7 feet above the roof.
All open vent pipes that extend through a roof shall be terminated at least number inches mm above the roof except that where a roof is to be used for any purpose other than weather protection the vent extensions shall be run at least 7 feet 2134 mm above the roof.
Above the roof plumbing vent height.
How drain waste vent plumbing works.
All open vent pipes that extend through a roof shall be terminated at least number typically 6 inches mm above the roof except that where a roof is to be used for any purpose other than weather protection the vent extensions shall be run at least 7 feet 2134 mm above the roof.
Section 904 vent terminals roof used as.
Vent pipe in black model pbr 312 4bk 19 97 19 97.
2010 florida building code plumbing 904 1 roof extension.
Vents in these locations also should extend 610 mm 24 in above a roof.
Vent pipes should extend to outdoors above the building roof and should terminate vertically not less than 6 above the roof surface nor more than 24 and must be at least 12 from any vertical surface such as a nearby sidewall.
As shown in the large illustration below a house has at least one main stack.
Rubber electrical mast split pipe boot roof flashing in black model 81746 37 27 37 27.
Free delivery with 45 order.
Extensions of vent pipes through a roof shall be terminated at least 12 inches above such roof unless a roof is to be used for any purpose other than weather protection.
All open vent pipes that extend through the roof shall terminate at least 1 foot 305 mm above the roof except that if the roof is to be used for any purpose other than weather protection then the vent extension shall be run not less than 7 feet 2134 mm above the roof.
Gibraltar building products 11 in.
Perma boot vent pipe repair for 4 in.
Set your store to see local availability add to cart.
All open vent pipes that extend through a roof shall be terminated at least number inches mm above the roof except that where a roof is to be used for any purpose other than weather protection the vent extensions shall be run at least 7 feet 2134 mm above the roof.